Sep 24, 2024
New Batching Systems for Canning Line Projects
Plant Service Utility Piping System Fabrication and Installation, Sanitary Batching and Cooking Process System Fabrication and Installation, Heavy Equipment Setting, Sanitary Platform Fabrication and Installation, Modular Skid Fabrication, and Custom Sanitary Fabrication.
Sep 24, 2024
New Frozen Hot Pocket Line Project
Heavy Equipment Setting, ASME B31.1 Plant Service Utility Piping, and Sanitary Tube Fabrication to 3A Dairy Standards.
Sep 24, 2024
New Bottled Water Production Facility Projects (4) and Additional Bottling Line Installation Projects (9) completed at FL, ME, MI, TN, and TX plant locations
Heavy Equipment Setting, Platform and Equipment Support Fabrication, Sanitary Process System Fabrication and Installation to 3A Dairy Standards, and Plant Service Utility Piping Fabrication and Installation.
Sep 24, 2024
New Research Laboratory / De-Ionized Loop System Project
High Purity Equipment Setting, High Purity Structural Equipment Support Fabrication, High Purity System Fabrication and Installation to B31.3 BPE Code (30 laboratories, and over 140 points of use).
Sep 24, 2024
New Pharmaceutical Production Facility and Research Laboratory Projects
High Purity Equipment Setting, High Purity Bulk Processing System Fabrication and Installation to ASME B31.3 BPE Code, High Purity Modular Skid Fabrication, Stainless Steel Plant Service Utility Fabrication to ASME B31.1 Code, System Validation Support and Assistance.