Posted on | 09/19/2016

L’Oreal USA

(Projects and Processes Installed over 15 yr. period: Modernization/Automation Project, Shampoo, Alcohol Based Hair Spray, Hair Relaxer, Conditioner, Dye, Perm Solution, Bulk Truck Uploading, Pigging System, Reverse Osmosis Water System, and De-Ionized Water System)
Heavy Equipment Setting, Plant Services, B31.1 Plant Utility Piping, Sanitary Process System Fabrication and Installation, and High Purity System Fabrication and Installation to ASME B31.3 BPE Code (for De-ionized Water System).




We're Here to Serve Your Needs

Contact Us